Town of Fond du Lac Road Projects 2024
- Dixon Road: pulverize (completed 5/13), grade (completed 5/13), and repave
- County Road T: pulverize (started 5/13), grade (started 5/13), and repave (from Esterbrook to Towne Road in Rogersville; this is a county-funded project partially within the town)
- River Bend Road: pulverize, grade, and repave (scheduled Spring/Summer)
- Pastwood Lane: grade, widen, and place recycled asphalt grindings (TBA)
- Kennedy Drive: shouldering (TBA)
- Reinhart Road: shouldering (TBA)
- Martin Road: shouldering (TBA)
- Additional crack sealing on various town roads as budget allows