Town of Fond du Lac Road Projects 2024

Town of Fond du Lac Road Projects 2024

  • Dixon Road: pulverize (completed 5/13), grade (completed 5/13), and repave 
  • County Road T: pulverize (started 5/13), grade (started 5/13), and repave (from Esterbrook to Towne Road in Rogersville; this is a county-funded project partially within the town)
  • River Bend Road: pulverize, grade, and repave (scheduled Spring/Summer)
  • Pastwood Lane: grade, widen, and place recycled asphalt grindings (TBA)
  • Kennedy Drive: shouldering (TBA)
  • Reinhart Road: shouldering (TBA)
  • Martin Road: shouldering (TBA)
  • Additional crack sealing on various town roads as budget allows